
ABN
Emissions offsetting and renewable energy
We combine emissions offsetting with renewable Guarantees of Origin and on-site solar power for use in our operations.
Our environmental commitment
At ABN PIPE SYSTEMS, we continue to advance our sustainability strategy through three areas of action: emissions offsetting, the acquisition of renewable Guarantees of Origin and electricity generation for self-consumption.
Each serves a specific purpose and complements our work to reduce the environmental impact of our products and processes.
Offsetting 1,570 tonnes of CO₂ emissions
We have voluntarily cancelled 1,570 Certified Emission Reductions (CERs), equivalent to 1,570 tonnes of CO₂.
The credits relate to the “Wind power project by HIL at Gujarat, India”. The transaction is documented by the Clean Development Mechanism registry’s voluntary cancellation certificate, dated 11 September 2026.
Offsetting involves acquiring and cancelling credits from projects with verified emission reductions or removals. This action complements, and does not replace, measures to reduce our carbon footprint.
Our commitment is to offset 25% of the emissions arising from the manufacture of our products at the end of each financial year.
HIL wind power project in Gujarat, India
The “Wind power project by HIL at Gujarat, India” is registered under the United Nations Clean Development Mechanism (CDM) as project 6491. Developed by Hyderabad Industries Limited, it generates wind-powered electricity for supply to the grid in Gujarat, India.
ABN PIPE SYSTEMS’ voluntary cancellation is linked to this project: 1,570 Certified Emission Reductions (CERs), equivalent to 1,570 tonnes of CO₂, documented in the cancellation certificate dated 11 September 2026.
View the official CDM project 6491 record
Emissions offsetting
Electricity from renewable sources (3,473 MWh of wind-generated electricity)
We have cancelled 3,473 Guarantees of Origin (GOs), corresponding to 3,473 MWh of wind-generated electricity from the Fuente Álamo and Frontones wind farms in Spain. The cancellation took place on 16 October 2026.
GOs are electronic certificates that document how a given quantity of electricity was generated. Each guarantee corresponds to one megawatt-hour. Cancellation assigns those generation attributes to the beneficiary and prevents the same certificates from being traded again.
Our electricity commitment is to cover 25% of consumption for each financial year with renewable origin certificates, with annual monitoring.
Fuente Álamo wind farm, Spain
The Fuente Álamo wind farm is located in the province of Albacete, Spain. According to Elawan Energy’s project information, it has 10 wind turbines and an installed capacity of 50 MW.
In ABN PIPE SYSTEMS’ Guarantees of Origin certificate, 2,424 MWh relate to Fuente Álamo and 1,049 MWh to Frontones. Together, the two wind farms provide the renewable attributes of the 3,473 MWh of wind-generated electricity recorded in the document.
Electricity from renewable sources
Solar energy for self-consumption in Medina del Campo
The commissioning of our photovoltaic plant at the Medina del Campo facilities brings our own renewable electricity generation into our industrial operations.
The installation allows us to use solar energy to meet part of our electricity needs and reduce the amount of electricity purchased from the grid. Its contribution will be assessed by monitoring generation and self-consumption.
Photovoltaic energy therefore complements our emissions offsetting activities and the certification of the renewable origin of electricity.
Our track record
For the 2020 and 2021 financial years, we offset a total of 22 tonnes of CO₂: 10 tonnes for 2020 and 12 tonnes for 2021.
Information on these activities and on the DelAgua project in Eastern Africa and the small hydroelectric project in Karnataka is available in our archive.



